KING SAUD UNIVESITY

About This Project

KING SAUD UNIVESITY
(STUDENTS HOUSING -36 BLG’S)

Scope of Work: –

Supply, Installation, Testing & Commissioning the following: –

    1. Redesign the HVAC Drawings & Re-calculation the cooling Loads, Pumps Head, Fans Static pressure.
    2. Chilled water piping System completed with Valves, Insulation, Cladding, Rollers & Pipes Supports
    3. Air Ducting System completed with Dampers, Air outlets, VAV’s, Insulation & Cladding.
    4. Chilled water equipment (Chillers, Air Handling Units, Fan Coil Units, Fans, Variable Air Volume).
Consultant

Main Contractor

Clients

Services

Start Date

Completion Date

Category
HVAC WORKS